Update golang:1.23.4-bullseye Docker digest to d471e56 #546

Merged
renovate-bot merged 1 commit from renovate/golang-1.23.4-bullseye into master 2025-01-14 22:18:13 +00:00
Collaborator

This PR contains the following updates:

Package Type Update Change
golang stage digest bc4e428 -> d471e56

Configuration

📅 Schedule: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined).

🚦 Automerge: Enabled.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Renovate Bot.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | golang | stage | digest | `bc4e428` -> `d471e56` | --- ### Configuration 📅 **Schedule**: Branch creation - At any time (no schedule defined), Automerge - At any time (no schedule defined). 🚦 **Automerge**: Enabled. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Renovate Bot](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiIzOS4xMDYuMCIsInVwZGF0ZWRJblZlciI6IjM5LjEwNi4wIiwidGFyZ2V0QnJhbmNoIjoibWFzdGVyIiwibGFiZWxzIjpbXX0=-->
renovate-bot added 1 commit 2025-01-14 22:17:07 +00:00
Update golang:1.23.4-bullseye Docker digest to d471e56
All checks were successful
continuous-integration/drone/pr Build is passing
continuous-integration/drone/push Build is passing
0ab1c1e336
renovate-bot scheduled this pull request to auto merge when all checks succeed 2025-01-14 22:17:08 +00:00
renovate-bot merged commit 0ab1c1e336 into master 2025-01-14 22:18:13 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: walbeck-it/docker-nextcloud-spreed-signaling#546
No description provided.